Reinforced Soil Structure to Support Bow String Bridge at Kondapochamma Sagar Reservoir, Kaleshwaram, Telangana

Kaleshwaram, Telangana, India |  Government of Telangana Irrigation & C.A.D. Department

Overview

The Kondapochamma Sagar reservoir, located around 50 km from Hyderabad. This reservoir is another milestone in the multi-stage Kaleshwaram Lift Irrigation Scheme (KLIS) and was inaugurated in the last week of May 2020 by Telangana Chief Minister K Chandrashekhar Rao. This reservoir was constructed as part of the Telangana government’s efforts to make Godavari a perennial river. The Kondapochamma Sagar reservoir receives water from the Markook surge pool, which in turn receives water from Akkaram pump-house.

The 15.8 kilometre-long Kondapochamma Sagar has a capacity of 15 TMC. Its full-reservoir level is 618 m and is envisaged to provide irrigation to more than two lakh acres of ayacuts through 13 canals.

The end of bow string walkway bridge of reservoir needs to rest about 18m inward (towards reservoir side) from the edge of the top of the embankment at level + 622.300. Hence, a widening over 20m was desired from the top of the embankment. Intake wells were inside the reservoir. To connect the embankment with the intake wells, bowstring bridges were adopted.

Challenge

The present slope of the embankment was 1V: 2.5H. A steeper slope was needed to accommodate the seating of bowstring walkway bridge over the embankment. In order to create additional space adjoining to this is an existing embankment and to support the bow string walkway bridge, a reinforced soil structure was envisioned.

Solution

In order to create the additional space, a reinforced soil wall with Gabion fascia and Techstrap Geostrips reinforcement were decided to be adopted after evaluating various available options. The total vertical height of reinforced soil wall to be constructed was 16m (from +606.300 to +622.300). Hence, a two tired reinforced soil wall with no superimposed load from top wall on the bottom wall was found appropriate. Tiered wall ensured minimal reinforcement length to fulfill the need of the site not to disturb the core clay of the embankment.

The vertical exposed height was kept at 8.0m and the wall was to be raised to level +622.300 from a level +606.300 leaving a 3m berm in front of the toe of the wall. Considering the sloping surface in front of the reinforced soil wall and a waterfront structure, an embedment of 1.6m was considered.

And a gabion mattress in front of the reinforced soil wall (both top and bottom walls) was recommended to avoid the scour of the toe of the structure. It was proposed to have a graded filling material inside the gabions to protect the backfill from erosion.

TechStrap Geostrips are geosynthetic strips specially engineered for the reinforcement of soils and other fills for the construction of reinforced soil walls. TechStrap Geostrips comprise a core of closely packed and tensioned high tenacity polyester filament yarn tendons encased in a sheath of linear low density polyethylene.

Also, we have proposed TechCell Geocell filled with aggregate granular material as a reinforced foundation soil bed to support the loads coming from the bearing plate on the top reinforced soil wall.

Project Outcome & Performance

The construction of Reinforced Soil Wall is completed successfully. Extremely satisfied with the structure workmanship and materials, the department has decided to adopt the same system for the other two intake wells.

Frequently Asked Questions
(FAQs)

The bow string walkway bridge required seating over the embankment, but the existing slope (1V:2.5H) was too gentle. To create additional space and support the bridge safely, a reinforced soil wall was envisioned.

The need to widen the embankment without disturbing its clay core, accommodate a vertical height of 16 m, and ensure stability against waterfront scour posed significant geotechnical challenges.

TechFab India proposed a two‑tier reinforced soil wall with gabion fascia and TechStrap Geostrips reinforcement. Gabion mattresses were added at the toe to prevent scour, while TechCell Geocell was used to reinforce the foundation soil bed.

A two‑tier configuration minimized reinforcement length and avoided superimposed loads from the upper wall onto the lower wall, ensuring stability without disturbing the embankment’s clay core.

  • TechStrap Geostrips: Provided tensile reinforcement to stabilize the soil.
  • Gabion fascia & mattresses: Protected against erosion and scour.
  • TechCell Geocell: Reinforced the foundation soil bed for load distribution.
  • TechGeo PP Nonwoven Geotextiles: Offered separation and filtration functions.
  • TechFab Metal Gabion
  • TechFab Metal Gabion Mattress
  • TechStrap Geostrips
  • TechGeo PP Nonwoven Geotextiles
  • TechCell Geocell

The reinforced soil wall was successfully constructed, providing safe support for the bow string bridge. The Government of Telangana’s Irrigation & C.A.D. Department was highly satisfied and decided to adopt the same system for two additional intake wells.

By integrating gabions, geostrips, geocells, and geotextiles into a complex waterfront structure, TechFab India demonstrated its ability to deliver durable, cost‑effective, and innovative geosynthetic solutions for critical infrastructure projects.